skip to main | skip to sidebar

Bob & Linda Build a house in Brookings

Friday, December 31, 2010

Paint and tile - Great Room and upstairs bath.


Posted by Bob & Linda Beaudry - Build a house at 7:09 PM No comments:

Installing floors in bedrooms.


Posted by Bob & Linda Beaudry - Build a house at 7:08 PM No comments:

Wednesday, December 29, 2010

Wood floor installation.


Posted by Bob & Linda Beaudry - Build a house at 3:52 PM No comments:

Master Bath tiling.


Posted by Bob & Linda Beaudry - Build a house at 3:51 PM No comments:

Sunday, December 5, 2010

View from Highway 101.


Posted by Bob & Linda Beaudry - Build a house at 7:37 PM No comments:

Saturday, December 4, 2010

East and West attic areas.


Posted by Bob & Linda Beaudry - Build a house at 9:11 PM No comments:

Bedroom 4.


Posted by Bob & Linda Beaudry - Build a house at 9:10 PM No comments:

Bedroom 3.


Posted by Bob & Linda Beaudry - Build a house at 9:09 PM No comments:

Second floor bath.


Posted by Bob & Linda Beaudry - Build a house at 9:08 PM No comments:

Master bedroom and bath.


Posted by Bob & Linda Beaudry - Build a house at 9:06 PM No comments:

Guest bedroom and bath.


Posted by Bob & Linda Beaudry - Build a house at 9:05 PM No comments:

Study.


Posted by Bob & Linda Beaudry - Build a house at 9:04 PM No comments:

Kitchen.


Posted by Bob & Linda Beaudry - Build a house at 9:03 PM No comments:

Great room.


Posted by Bob & Linda Beaudry - Build a house at 9:02 PM No comments:

Entrance foyer


Posted by Bob & Linda Beaudry - Build a house at 9:01 PM No comments:

Thursday, November 25, 2010

View from the deck on a clear day.


Posted by Bob & Linda Beaudry - Build a house at 7:12 PM No comments:

Installing the sheetrock for walls and ceiling.

Posted by Bob & Linda Beaudry - Build a house at 7:08 PM No comments:

Wednesday, November 17, 2010

Rear view of house.


Posted by Bob & Linda Beaudry - Build a house at 7:20 PM No comments:

Front porch area graded.


Posted by Bob & Linda Beaudry - Build a house at 7:19 PM No comments:

Basement walkout level graded.


Posted by Bob & Linda Beaudry - Build a house at 7:17 PM No comments:

Insulation in place.


Posted by Bob & Linda Beaudry - Build a house at 7:15 PM No comments:

Monday, November 15, 2010

Rear deck nearly complete.


Posted by Bob & Linda Beaudry - Build a house at 7:52 PM No comments:

Front porch complete except for trim over posts.


Posted by Bob & Linda Beaudry - Build a house at 7:50 PM No comments:

Wednesday, November 10, 2010

Working on the deck today.


Posted by Bob & Linda Beaudry - Build a house at 8:09 PM No comments:

Saturday, November 6, 2010

Porch slab inplace.


Posted by Bob & Linda Beaudry - Build a house at 4:56 PM No comments:

Roof drainage system details.


Posted by Bob & Linda Beaudry - Build a house at 4:55 PM No comments:

Monday, November 1, 2010

Finishing up on the siding.


Posted by Bob & Linda Beaudry - Build a house at 6:29 PM No comments:

Wednesday, October 27, 2010

Rear siding is complete.


Posted by Bob & Linda Beaudry - Build a house at 8:26 PM No comments:

Friday, October 22, 2010

Rear view from Rte 101.


Posted by Bob & Linda Beaudry - Build a house at 7:53 PM No comments:

Siding panels are being installed.

Posted by Bob & Linda Beaudry - Build a house at 7:50 PM No comments:

Wednesday, October 20, 2010

Installing siding on rear lower level.


Posted by Bob & Linda Beaudry - Build a house at 8:23 PM No comments:

Fireplace has been installed.


Posted by Bob & Linda Beaudry - Build a house at 8:22 PM No comments:

Sunday, October 17, 2010

Most of the trim is up and painted.


Posted by Bob & Linda Beaudry - Build a house at 7:17 PM No comments:

Great Room from 2nd floor.


Posted by Bob & Linda Beaudry - Build a house at 7:15 PM No comments:

Second floor bedrooms.


Posted by Bob & Linda Beaudry - Build a house at 7:14 PM No comments:

Attic areas/


Posted by Bob & Linda Beaudry - Build a house at 7:12 PM No comments:

I've painted 255 siding panels and have 190 to go.


Posted by Bob & Linda Beaudry - Build a house at 7:09 PM No comments:

Wednesday, October 13, 2010

Siding and trim being installed.


Posted by Bob & Linda Beaudry - Build a house at 7:47 AM No comments:

Monday, October 11, 2010

Working on the soffits.


Posted by Bob & Linda Beaudry - Build a house at 1:31 PM No comments:

Tuesday, October 5, 2010

Roof is complete and most windows are in.


Posted by Bob & Linda Beaudry - Build a house at 8:45 PM No comments:

Monday, October 4, 2010

Windows being installed.


Posted by Bob & Linda Beaudry - Build a house at 8:34 PM No comments:

Sunday, October 3, 2010

Roof shingles in progress.


Posted by Bob & Linda Beaudry - Build a house at 8:54 PM No comments:

Friday, October 1, 2010

Shingling roof today.

Posted by Bob & Linda Beaudry - Build a house at 11:01 AM No comments:

Thursday, September 30, 2010

Wrapping the house with Tyvex Drainwrap.


Posted by Bob & Linda Beaudry - Build a house at 11:07 PM No comments:

Doors and Windows arrived.


Posted by Bob & Linda Beaudry - Build a house at 11:06 PM No comments:

Second floor framing in progress.


Posted by Bob & Linda Beaudry - Build a house at 11:04 PM No comments:

Wednesday, September 29, 2010

View from Napa Lane - working on interior framing.


Posted by Bob & Linda Beaudry - Build a house at 8:03 PM No comments:

Monday, September 27, 2010

Roof is now weatherproof.


Posted by Bob & Linda Beaudry - Build a house at 9:24 AM No comments:

Thursday, September 23, 2010

More porch photos.


Posted by Bob & Linda Beaudry - Build a house at 8:15 PM No comments:

Porch added today.


Posted by Bob & Linda Beaudry - Build a house at 8:13 PM No comments:
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Followers

Blog Archive

  • ►  2011 (54)
    • ►  June (3)
    • ►  May (5)
    • ►  April (4)
    • ►  March (9)
    • ►  February (15)
    • ►  January (18)
  • ▼  2010 (136)
    • ▼  December (15)
      • Paint and tile - Great Room and upstairs bath.
      • Installing floors in bedrooms.
      • Wood floor installation.
      • Master Bath tiling.
      • View from Highway 101.
      • East and West attic areas.
      • Bedroom 4.
      • Bedroom 3.
      • Second floor bath.
      • Master bedroom and bath.
      • Guest bedroom and bath.
      • Study.
      • Kitchen.
      • Great room.
      • Entrance foyer
    • ►  November (12)
      • View from the deck on a clear day.
      • Installing the sheetrock for walls and ceiling.
      • Rear view of house.
      • Front porch area graded.
      • Basement walkout level graded.
      • Insulation in place.
      • Rear deck nearly complete.
      • Front porch complete except for trim over posts.
      • Working on the deck today.
      • Porch slab inplace.
      • Roof drainage system details.
      • Finishing up on the siding.
    • ►  October (16)
      • Rear siding is complete.
      • Rear view from Rte 101.
      • Siding panels are being installed.
      • Installing siding on rear lower level.
      • Fireplace has been installed.
      • Most of the trim is up and painted.
      • Great Room from 2nd floor.
      • Second floor bedrooms.
      • Attic areas/
      • I've painted 255 siding panels and have 190 to go.
      • Siding and trim being installed.
      • Working on the soffits.
      • Roof is complete and most windows are in.
      • Windows being installed.
      • Roof shingles in progress.
      • Shingling roof today.
    • ►  September (29)
      • Wrapping the house with Tyvex Drainwrap.
      • Doors and Windows arrived.
      • Second floor framing in progress.
      • View from Napa Lane - working on interior framing.
      • Roof is now weatherproof.
      • More porch photos.
      • Porch added today.
    • ►  August (31)
    • ►  July (17)
    • ►  June (7)
    • ►  May (8)
    • ►  January (1)

About Me

My photo
Bob & Linda Beaudry - Build a house
View my complete profile